ARTEMI · Method
How We Work
From the survey sheet to the visit a year after handover — the sequence every ARTEMI frame follows, and the questions worth answering before anything is specified.
The showroom
The Showroom as a Test
Everything on the floor is a working assembly.
- Movement
- Sliding leaves are hung on their production hardware at full weight, so the effort of the hand is the real one — not a showroom sample running on a short track.
- Sightline
- Frames are shown at the sightline they will be built at. Where a system's slimmest profile needs a structural condition to achieve it, that condition is stated rather than hidden.
- Acoustics
- Closed against street noise, a laminated build-up is audibly different from a standard double unit. It is the easiest specification decision to make in person and the hardest to make from a table.
- Finish
- Anodised and powder-coated samples sit side by side under the same light. Metallic coatings shift with viewing angle; we ask clients to walk past them before choosing.
- Drainage
- Sections are cut open where they can be. A frame's drainage path is the part of a façade that decides whether it survives a decade of tropical rain, and it is invisible once installed.
The workshop
The Sequence of a Frame
Eight stations, in order, every time.
- 01Survey
- The opening is measured as built. Every later dimension descends from this sheet, not from the architect's grid.
- 02Cutting list
- Profiles are optimised across stock lengths, with an allowance held back for adjustment rather than consumed by it.
- 03Saw
- Double-mitre cutting to length and angle. Blade condition is checked by the cut face, not the calendar.
- 04Machining
- Drainage slots, hardware pockets, fixing holes and end mills, routed to the system house's published detail.
- 05Assembly
- Corners cleated, crimped or screwed as the system requires, then sealed. Squareness is measured on the diagonal.
- 06Glazing
- Units set on their designed bearing points, packed and gasketted. A unit that is not fully supported will fail at its edge seal first.
- 07Bench test
- Every moving leaf is cycled on the bench. Hardware is adjusted before the frame is wrapped, not after it is installed.
- 08Protection
- Wrapped, labelled by opening reference and loaded in installation order, so no frame is handled twice on site.
The sequence never changes. What changes is how long each station takes.
Quality
What We Check, and Against What
A frame is only as true as the last thing measured.
Tolerance is the whole argument of a slim frame. The thinner the sightline, the less room there is to absorb a structural deviation, and the more of the building's inaccuracy the façade is asked to swallow. We resolve that where it is cheap to resolve — on the survey sheet and at the bench — rather than on a scaffold.
- At the bench
- Diagonal equality on every assembled frame · corner face alignment · gasket continuity around the full perimeter · drainage path proven clear with water · hardware cycled and adjusted under load
- On site
- Opening dimension and plumb before delivery · substrate capable of the designed fixing · packing and shimming to designed bearing · perimeter seal in two lines, not one · closing pressure even along the leaf
- Against the system
- Each system house publishes maximum leaf sizes, weights and spans. We specify inside those, not at the edge of them — a system run at its published limit has no margin left for a building's own movement.
- Against the climate
- Indonesian rain arrives horizontally and in volume. Water performance, not thermal performance, is the figure that decides a tropical façade — and it depends on drainage detail far more than on frame depth.
Method
Working with Architects
Seven stages, from first sketch to signed handover.
- 01Brief
- Intent, exposure, budget and programme. What the opening is for, before what it is made of.
- 02System selection
- Two or three candidate systems, with their real trade-offs stated — sightline against span, slimness against cost, movement against seal.
- 03Detailing
- Head, jamb, sill and interfaces drawn against the architect's build-up. Junctions with other trades resolved on paper first.
- 04Mock-up
- On projects where a corner or a threshold carries the design, we build it full size before we build fifty of it.
- 05Fabrication
- The eight-station sequence above, scheduled against the site's true readiness rather than its optimistic programme.
- 06Installation
- Our own crews, in installation order, with the survey sheet in hand. Water-tested where the detail warrants it.
- 07Handover
- Operation and cleaning instructions, finish and glass records, hardware schedule, and the name of the person to call.
What we need from you
Structural openings within stated tolerance, a decision on finish before fabrication opens, and access in the sequence agreed. Those three protect the programme more than any contingency.
Method
Six Questions Before Specifying
Answer these and the system chooses itself.
- How big is the largest leaf?
- Leaf area and weight set the hardware, and hardware sets the frame. A single answer here eliminates half the catalogue.
- Does it need to disappear?
- A minimal sightline is a structural decision taken early — pockets in walls, floors and ceilings to receive it. Retrofitted, it is no longer minimal.
- What is the exposure?
- Coastal salt, driven rain, a west elevation at four in the afternoon. Exposure decides coating, gasket and drainage before it decides appearance.
- Who will operate it?
- A leaf a household opens daily is a different specification from one a facilities team opens seasonally. Motorisation is a maintenance decision, not a luxury one.
- Is shading part of the design?
- Solar control resolved in the envelope — louvre, screen, pergola or blind — costs less over a building's life than solar control resolved by cooling.
- Where does the water go?
- Every opening is also a drain. If the path from glazing rebate to outside air cannot be drawn, the detail is not finished.
Bring us
Elevations with opening sizes · a section through the head and sill zone · the wall build-up · the exposure and orientation · your intent for the sightline. From that we can answer with systems, limits and a price that will not move.
After-sales
After Completion
A relationship that continues well beyond handover.
A façade is a mechanism as much as a surface. Rollers wear, gaskets take a set, sealant ages, and a leaf that ran perfectly in its first year will want adjustment in its third. None of that is failure; all of it is maintenance, and it is far cheaper when it is expected. We keep the record of what was installed — system, finish batch, glass build-up, hardware schedule, opening references — so a call five years from now does not begin with guesswork. Wearing parts are held as stock items rather than ordered against a discontinued profile.
- Year 1
- Post-occupancy visit. Hardware re-adjusted after the building has settled and dried out; the owner is shown the cleaning regime on their own frames.
- Annual
- Drainage paths cleared, tracks cleaned, moving hardware lubricated and re-set, perimeter seals inspected. Half an hour per opening prevents most of what we are otherwise called out for.
- On call
- Glass breakage, storm damage, a motor or controller fault. Replacement units are ordered against the original build-up record, not re-measured from a broken frame.
- Long term
- Re-gasketting and re-sealing at the end of the sealant's service life, and hardware upgrade paths where a system house has improved a component we can retrofit.
The measure of a façade is not how it looks when it is handed over. It is how it looks, and moves, ten years later.
A note on performance
Four Figures, and What They Mean
The numbers a façade is actually judged by.
- Air
- Leakage through the closed joint, measured at rising pressure. It governs how much conditioned air a building loses through its frames — and, in a noisy street, how much sound arrives with it. An air-tight frame is the precondition for every other figure.
- Water
- Resistance to driven rain, again at rising pressure. This is the figure that matters most here: a tropical storm applies water and wind simultaneously, and a frame that passes on water at low pressure will pass it in volume at high.
- Wind
- Structural capacity — deflection under design load without permanent damage. It sets maximum leaf and span dimensions, and it is the reason a system's published size limits are limits rather than suggestions.
- U-value
- Heat transmission through frame and glass together. In a cooled building it is a comfort figure as much as an energy one — a warm inner frame face radiates onto whoever is sitting beside it.
Two cautions. A figure belongs to a tested configuration, not to a brand — the same system in a larger leaf performs differently. And the installed joint governs the result: a class-leading frame sealed badly at the perimeter performs worse than a modest frame sealed well. We quote figures per configuration, and we detail the perimeter as carefully as the frame.
A note on minimal frames
What Slimness Costs
Said plainly, before the drawing is issued.
Minimal glazing is the most requested and least understood thing we sell. It is worth saying what it demands, because a client who understands the trade in advance is delighted by the result, and one who does not feels misled by physics.
- Structure, brought forward
- The head must carry the leaf and the slab above without transferring deflection into the track. That is a beam sized at design stage, not a lintel chosen on site.
- Tolerance, tightened
- With no frame face to cover a discrepancy, the opening must be built to millimetres. We survey before fabricating and will ask for correction where it is needed.
- Maintenance, accepted
- Floor channels collect what floors collect. They are designed to be cleaned, and they need to be — a blocked channel is the most common cause of a leaking minimal threshold.
- Insect screening, planned
- In this climate a screen will be wanted eventually. Designed in, it hides in the same pocket as the leaf; added later, it is the thing the eye lands on.
- Glass, upgraded
- Large panes need thicker laminated build-ups for safety and stiffness, which raises weight, which raises hardware — a chain worth pricing at the start.
- Programme, respected
- Imported minimal systems are made to order. The lead time is real and cannot be compressed by paying more for it.
None of this is an argument against minimal glazing. It is the argument for deciding on it early.
A note on shading
Shading by Orientation
Near the equator the sun is overhead, and that changes the answer.
- East
- Low morning sun, straight into the glass. Horizontal overhangs achieve almost nothing here; vertical fins or a movable screen do the work. Heat arrives before the building's cooling load has been reached, so this elevation sets the morning comfort of the whole house.
- West
- The hardest elevation in the tropics. Low afternoon sun on a structure that has been absorbing heat all day. Movable external shading with wind-rated guides is the only reliable answer; fixed louvres either block the view permanently or fail at four o'clock.
- North & South
- The forgiving orientations, but not exempt: this close to the equator the sun crosses to both sides of the building through the year, so a north elevation takes direct sun for months. Modest horizontal shading suits both.
- Roof
- The most exposed plane of all, and the one most often glazed without shading. A skylight without integral shading or a high-performance build-up will heat the room beneath it beyond what cooling can recover — which is why we specify rooflights with shading, not after it.
The rule of thumb we work to: shade the roof first, the west second, the east third, and treat glass coatings as the last refinement rather than the first move. Shading that moves beats shading that is merely present, and the sensor that retracts it in wind is what makes it last.
Technal
Where a Curtain Wall Earns Its Place
Three conditions that decide the specification.
- A tall elevation
- Above three storeys, wind load and building movement stop being abstractions. A curtain wall absorbs both through its own joints, transoms and anchor design — which a run of individual windows cannot do, however well each one is made.
- A tendered performance class
- When the specification names air, water and wind classes, the answer has to come from a tested system installed to its tested detail. Substituting a profile of similar depth voids the evidence, whatever the section drawing looks like.
- Many openings, one language
- A hotel, an office or a school has hundreds of openings in a dozen types. Drawing them from one family keeps sightlines, finishes and spares consistent — and keeps the maintenance manual to a single volume.
- What we hold
- Gaskets, drainage components and hardware for the systems we have installed, so a repair does not begin with a shipping quotation.
- Performance figures
- Air, water and wind classes are quoted per system and per configuration on request. We do not publish a single headline figure, because there is no single figure that is honest.
Choosing between systems
Choosing Between Systems
Read down the left column and stop at the first line that describes your opening.
| The condition | Start with |
|---|---|
| The threshold is the architecture, and the structure is not yet built | OTIIMA·FREMO Invisi |
| A large glazed opening in an existing wall, exposed to weather | Reynaers·FREMO |
| A whole elevation, several storeys, tendered to performance classes | Technal |
| Hundreds of ordinary openings that must match each other | Technal·FREMO |
| An interior partition that should read as a line | FREMO Pure |
| The middle of the plan has no daylight | FREMO Skylight |
| A west elevation overheats every afternoon | WAREMA |
| A terrace is unusable in sun and unusable in rain | FREMO Open Air |
| A balcony should become a room, and open fully again | FREMO Lifting Window |
| A screen, gate or panel that does not exist as a product | CNC |
This table is a starting point, not an answer. Most projects use three or four of these houses together — a minimal system on the principal opening, a working range everywhere else, shading on the exposed elevations and a rooflight where the plan runs deep. Coordinating that combination is the part we are actually paid for.
For architects
Send elevations, a head-and-sill section, the wall build-up and the orientation. We will answer with candidate systems, their published limits and a price that will not move.
For clients
Come to a showroom before you decide anything. Open and close the doors, listen to the street through the glass, and hold the hardware. It settles most questions in twenty minutes.
